Using Optioneer, this transmission developer cut early routing studies from 6 weeks to 1 day

To meet the demands of PJM’s 60-day RTEP window and ensure reliability of the transmission grid, this major transmission developer is challenging the traditional methodologies of transmission routing and siting.

4500

miles of transmission developed in 5 days.

2x

PJM portfolio projects awarded.

1.6x

PJM portfolio value awarded.

The challenge

How can a utility effectively evaluate dozens of potential solutions in a 60-day competitive project window?

Traditional methods are extremely time consuming. Developing and modifying a single route was a laborious process that could take months of expert time.

With limited data integration planners could only consider a few data layers (like terrain and major environmental zones) during each iteration. A comprehensive analysis incorporating hundreds of complex factors simultaneously was impossible.

Tedious development restricted the number of projects the utility could confidently evaluate within the tight competitive window, limiting the solutions they could propose.

The process

The deployment objective was to allow consideration of more potential projects by completing route generation and risk analysis as fast as power flow studies could identify candidate solutions. The goal was to increase the portion of the PJM RTEP budget awarded to the customer.

Optioneer was immediately deployed for every potential project in the RTEP window and for retrospective analysis of projects currently in development.

The deployment objective was to allow consideration of more potential projects by completing route generation and risk analysis as fast as power flow studies could identify candidate solutions. The goal was to increase the portion of the PJM RTEP budget awarded to the customer.

Optioneer was immediately deployed for every potential project in the RTEP window and for retrospective analysis of projects currently in development.

The results

From Months to a Day: In just one day of processing, Optioneer delivered five complete, distinct, and viable route solutions, providing the necessary insights to move the project from concept to viable bid candidate.

Validation and Confidence: The segments of these five routes matched approximately 80% of the final route the customer had painstakingly developed over months. This provided immediate and powerful validation of Optioneer’s accuracy and its ability to replicate the complex logic of experienced siting professionals.

Beyond a Line on a Map: Optioneer provided a heatmap of the entire project region revealing which areas were most favorable for routing and which posed significant risk. This allowed engineers to understand the landscape as a whole and move through additional iterations with confidence.

From Months to a Day: In just one day of processing, Optioneer delivered five complete, distinct, and viable route solutions, providing the necessary insights to move the project from concept to viable bid candidate.

Validation and Confidence: The segments of these five routes matched approximately 80% of the final route the customer had painstakingly developed over months. This provided immediate and powerful validation of Optioneer’s accuracy and its ability to replicate the complex logic of experienced siting professionals.

Beyond a Line on a Map: Optioneer provided a heatmap of the entire project region revealing which areas were most favorable for routing and which posed significant risk. This allowed engineers to understand the landscape as a whole and move through additional iterations with confidence.

Developed over 12,000 miles of transmission during the window (over 4,500 miles in one week).

Increased participation and awards across every metric.

Increased their share of the awarded portfolio by 60% over 2024 (pre-Optioneer).

The impact
Traditional method With Optioneer
Route design 9 months 3 months
Resource time 216 days FTE time 72 days FTE time
Route iterations 1–7 days per change 10 mins–2 hrs per change
Major reroute 32 days 10 mins–2 hrs
Bottlenecks High time cost per task Higher output per team member
Communication Email chains, regular meetings, iterations In-platform comments, interactive visuals, real-time adjustments

Have you got a similar project to deliver?

Reach out today and see how Optioneer can help streamline your project planning and development.

Related success stories

We’ve had the pleasure of working with global leaders in the utilities industry, find out how they achieved results with Optioneer.

Discuss your project
Learn how Optioneer can accelerate your project development programmes
Ready to revolutionise your project development process? Schedule a no-obligation discussion with our team.
OPTIONEER CAN HELP YOU TO
Cut programme length
Demonstrate a robust selection process
Build consensus with key stakeholders
We’ll help you succeed
Our team of product experts will help set up your project in Optioneer and ensure you and your team achieve your goals.
 *
Please fill in the first name
 *
Please fill in the last name
 *
Please fill in a valid email
Please fill in the company name

By clicking the Get in touch button you accept Continuum Industries’ Privacy Policy and agree to receive promotional messages from Continuum Industries about its products and services. You can unsubscribe at any time by clicking on the link at the bottom of our emails.

Clock
Thank you for contacting us!

We will be in touch with you shortly.

Oops! Something went wrong while submitting the form.